Once the router was finished cranking out all the pieces of the Lark Rise project it was time to start in on assembly. The first task was to weld up a steel frame that would go through the sign and also down the post to provide structural strength.
Although the sign board looks like it can swing it is actually welded in place. The horizontal steel pipe is welded to the vertical pipe that goes from top to bottom through the middle of the post.
I used my die grinder to carve in the woodgrain into the post. The vertical cracks and splits were done with a narrow bit in the same machine.
I have a little more work to do on the back before we begin the priming and paint but it is almost ready to go already.
Stay tuned for more...
-dan